Cummings Lodge Road Link Reaches 75% as Highway Access Expands
The 1.8-kilometre concrete-road programme is 75% complete, advancing a direct connection between Cummings Lodge and the Aubrey Barker corridor.
The 1.8-kilometre concrete-road programme is 75% complete, advancing a direct connection between Cummings Lodge and the Aubrey Barker corridor.